|
Concrete Slabs
- 2 new trucks at 35 metres per hour
- Pump and operator controlled
- We can pump at various mixes that are required
for your job
- Using 3" down to 2 1/2"
hoses
- Blowing out using all safety precautions, i.e.
a blowout sheet and sponge catcher which is connected to end of
hose for your safety
|